INSTALLATION SUCCESS FOR NEW BRAWOLINER® CONTRACTOR
Wednesday, August 17, 2011 at 3:36PM Cambridgeshire-based drainage contractor Dal-Rod Cambridgeshire recently undertook its first ever lining operation with the BRAWOLINER® system on a project in Epping Forrest. Working for managing contractor AMEC, the project was required to renovate drains at the Epping Forest college campus. The local authority required rehabilitation of the sewer, which runs under a main highway between the college and a public walk way, to be completed using Brawoliner® as a preferred method of repair. The majority of the pipes comprised 225 mm or 150 mm diameter pipes which were suffering from numerous cracks, joint displacements and fibrous root intrusions, as well as egress & ingress of sewer and ground water flows.

